NCS Consultants, LLC Projects - MC Contract: I-17
Home About Us Capabilities Personnel Projects Downloads Photo Gallery Other
This project is currently under construction.

Plan view of I-17 MC Contract project limits and the effected interchanges. NCS role in ADOT's management consultant contract (MC Contract) is as a sub consultant to Parsons Brinkerhoff. Our scope included field investigation, foundation and pavement recommendations in support of 30% design phase. The Arizona Department of Transportation (ADOT) is proposing to widen the existing Interstate 17 (I-17) as part of the Management Consultant Contract between Downtown Phoenix and Black Canyon City. The first phase of the project calls for widening of I-17 between SR 101L and Carefree Highway. ADOT retained Parsons Brinkerhoff (PB) to prepare the design for the 30% stage. NCS performed the geotechnical investigations under subcontract to PB.

The reconstruction of mainline I-17 will include 13 bridge structures and pavement design. Some existing bridges are being widened on the inside, others are being replaced completely. Additionally, several new traffic interchanges (TI) are proposed for construction including bridge structures and possibly retaining walls. The field investigation program conducted by NCS included 50 borings for the various bridge structures and the pavement analysis. Due to the hard soils at the site, the tubex system (air rotary) was used for drilling the deep structural borings while conventional hollow stem augers were used for the pavement borings.

Portions of this project are currently under construction.

Major reconstruction of approximately 10 miles of freeway north of Downtown Phoenix.

13 bridges structures and pavement design

Project Snapshots

One of the existing structures along I-17 that will eventually be reconstructed. NCS role in ADOT's management consultant contract (MC Contract) is as a sub consultant to Parsons Brinkerhoff. Our scope included field investigation, foundation and pavement recommendations in support of 30% design phase.

One of the existing structures along I-17 that will eventually be reconstructed. NCS role in ADOT's management consultant contract (MC Contract) is as a sub consultant to Parsons Brinkerhoff. Our scope included field investigation, foundation and pavement recommendations in support of 30% design phase.

 
 