NCS Consultants, LLC NCS Photo Gallery - SR 264: Second Mesa Geofoam Wall
Home About Us Capabilities Personnel Projects Downloads Photo Gallery Other
Back to NCS Photo Gallery Index
SR 264: Second Mesa Geofoam Wall (53 Images) - Click here for more project info
The SR 264: Second Mesa project was a rockfall containment and safety project. Initial designs for this challenging project involved several side-hill MSE retaining walls. A value analysis was performed, and NCS was asked to help come up with alternative wall/fill schemes under our On-Call contract with ADOT. During the value analysis process, 2 walls were eliminated, and the other two were redesigned by the team to be an innovative hybrid of soil-nail wall and GeoFoam platform combined with pre-cast concrete facing.
Placing the concrete for the load distribution slab on top of the geofoam blocks on the SR 264 project. Photo courtesy of ADOT Holbrook District. Placing the concrete for the load distribution slab on top of the geofoam blocks on the SR 264 project. Photo courtesy of ADOT Holbrook District. Geofoam blocks used in front of a soil-nail stabilized embankment on the SR 264 project. Photo courtesy of ADOT Holbrook District. Geofoam blocks used in front of a soil-nail stabilized embankment on the SR 264 project. Photo courtesy of ADOT Holbrook District. An overview of the SR 264 project site, which uses geofoam blocks in front of a soil-nail stabilized embankment with a facing wall. Photo courtesy of ADOT Holbrook District. Drilling performed by Crux for Western Technologies, Inc. in the location of a proposed MSE retaining wall that was later value engineered to a different system. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Excavating the first bench for the soil-nail wall. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. The first bench for the soil-nail wall. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. The first bench for the soil-nail wall. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Applying shotcrete to the first bench for the soil-nail wall. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Nail head with reinforcement. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Nail installation on the first bench. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Anti-termite treatment prior to shotcreting the first soil-nail bench. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. The first soil nail bench. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. A view of the existing slope during the geotechnical investigation phase. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. A view of the existing slope showing the extreme temperatures encountered at the site. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. A view of the existing slope prior to construction. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Preparing the next soil-nail wall bench. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Soil-nail installation. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Shotcrete placement. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Forming the fascia wall footing. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Geofoam blocks waiting to be installed. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. The prepared fascia wall footing. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Preparing the leveling course. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Placing the geofoam blocks. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Placing the geofoam blocks. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. The interface between the geofoam and the soil-nail wall. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Load distribution slab and reinforcement that will be used to structurally connect the precast fascia panels. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Reinforcement for the load distribution slab. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Nearly completed geofoam installation. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Load distribution slab. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Installing additional soil-nails. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Installing additional soil-nails. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Pouring concrete for the load distribution slab. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Pouring concrete for the load distribution slab. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Anti-termite chemical treatment. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Anti-termite chemical treatment. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Gasoline-resistant geo-membrane to protect the polystyrene geofoam. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Placing the precast concrete fascia panels. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Placing the precast concrete fascia panels. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Placing the precast concrete fascia panels. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Partial completion of the Placing the precast concrete fascia panels. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. Finishing the road base and preparing for final paving. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of Bharat Kandel, ADOT. SR 264 - Second Mesa site plan during the Pre-Design phase and up to the 60 percent design phase. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of AZTEC Engineering, Inc. SR 264 - Second Mesa site plan after the value analysis stage. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Photo courtesy of AZTEC Engineering, Inc. Completed Completed Completed Completed Completed Project location map for the SR 264 - Second Mesa project. The SR 264 - Second Mesa project involved a hybrid soil-nail retaining wall and geofoam installation with precast concrete facing panels in a side-hill highway widening application. Image courtesy of AZTEC Engineering, Inc. NCS was a member of the AZTEC Engineering Team that received the 2006 ACEC Grand Award for the SR 264 Second Mesa Project.
Back to NCS Photo Gallery Index
 
 

Page Last Updated on 01/16/09 11:14 am MST (-07:00)

Copyright © NCS Consultants LLC, 2004 - 2010
All Rights Reserved