| NCS performed the geotechnical investigations and design for this section of the I-10 widening project under subcontract to HDR. The complete reconstruction of mainline I-10 will include 6 new bridges, 17 retaining walls totaling nearly 14,000 linear feet of walls, drainage structures paralleling the corridor, and pavement design. The field investigation program conducted by NCS included 122 borings for the various structures. A combination of drill rigs was required, including conventional truck mounted, track mounted for drilling on slopes, and difficult access rigs for the sides of steep embankment slopes.
Photo Credits: Some photos during the construction phase are courtesy of ADOT, in particular Antonio Conte. Several others are courtesy of Ted Buell with HDR, Inc. |