NCS Consultants, LLC Capabilities - Construction Consultation
Home About Us Capabilities Personnel Projects Downloads Photo Gallery Other
Where the Materials Meet the "Road"

The goal of any new Civil Engineering project is the eventual construction of some end product. Too often engineers forget about this ultimate objective and don't step foot outside of the office, considering their job to be done once the report or plans leaves their hands.

Field visit for drilled shafts with defects. Owner required the contractor to excavate down to the defect for verification. <strong><a href='/photos/index.php?a=puschview'>Click here for more photos in this album.</a></strong> NCS has consistently been available to our clients for post-design services and other construction consultation and troubleshooting. We have performed services such as training of inspectors, interpretation of drilled shaft integrity test data, proposing fixes for defective drilled shafts, interpreting soil nail test data, review of value engineering proposals, and observation of construction procedures to name just a few.

We will stay involved in your project as long as you want, until the job is complete!

Back (Peer Reviews)

Jerome Soil Nail Wall - Inspected and reviewed results of verification testing program.

As part of the Jerome Emergency Wall Repair project, a soil nail verification test is performed to validate the design assumptions. The test nail was installed vertically through the roadway for convenience. <strong><a href='/photos/index.php?a=jerome'>Click here for more photos in this album.</a></strong>

Pusch View and 1st Avenue Bridges over Canada del Oro - Reviewed integrity test data for defective shafts and provided recommendations for repair.

Field visit for drilled shafts with defects. Owner required the contractor to excavate down to the defect for verification. <strong><a href='/photos/index.php?a=puschview'>Click here for more photos in this album.</a></strong>

 
 

Page Last Updated on 05/15/08 09:35 am MST (-07:00)

Copyright © NCS Consultants LLC, 2004 - 2008
All Rights Reserved